Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2448.7
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Sep 11, 2023     38-3 Beringer Brake System Re-Routing - (3 hours) Category: Brake System
I had to remove pedal and brake assembly in order to install long bolts on the pedals.
After installing the long bolts AN3-57, castle nut and cotter pin i reinstalled the pedal assembly and the brake lines. I am still fully satisfied with the brake fluid reservoir connection, as it seems that the brake line are putting tension on the brake reservoir tee.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.